a barrel of this: house Our House

Triple beam action

Posted by K Tue, 25 Apr 2006 04:29:00 GMT

Even though things were quiet for a while (in that we didn’t hear a lot for a week or so) there has been stuff going on at the house. The electrician has rewired everything, the bathroom floor joists are removed and replaced, insulation has been going up, an AC guy came by today to give us an estimate (on ducts and also AC, separately, in case we want to do the AC proper later even though it makes sense to get the ducts in now), and most excitingly, the kitchen beam is now in. Check out the pictures.

Now we have to pick a bunch of tile out for the bathroom floor. They are going to finish up some stuff this week and should be ready for that stuff soon. I think we know what we want, but we have to order it from Rockville and have someone pick it up and deliver it to the house for us. Whee. Also, time to make a sink decision so the plumbing rough-in can get in.

Posted in ,  | no comments | no trackbacks

Comments

Trackbacks

Use the following link to trackback from your own site:
http://house.abarrelofthis.com/articles/trackback/27

Comments are disabled